Preview made by Nextia for Cielo Concrete. Example details.

Excavator on a job site at sunset
480+pours finished
4.9 ★on Google
Hablamosespañol

Concrete that's still flat in twenty winters.

Driveways, patios, RV pads and foundations in West Valley City and across the valley. Proper base, rebar, and cuts in the right places.

Watch a pour, 0:48

Our work starts
below grade.

Most cracked driveways failed underneath. Cielo Concrete digs out soft clay, lays and compacts road base, and sets rebar on chairs before the first truck shows up. Then we cut joints where the slab wants to crack.

Finisher pulling a screed across a fresh concrete slab

What goes under every driveway we pour

  • Road base, compacted6 in.
  • Rebar grid, on chairs#4 at 18 in.
  • Air entrained mix4,000 psi
  • Control jointsEvery 10 ft

From call to cure.

Four steps. Most driveways are poured within two weeks of your first call.

01Site visit

We measure, check the grade and drainage, and send one written price within two days.

02Prep and forms

Old concrete out, soft soil dug out, base compacted, rebar tied, forms set so water runs away from the house.

03Pour and finish

Air entrained mix made for our freeze and thaw winters. Finished by hand, joints cut the same day.

04Cure and seal

Walk on it the next day, drive on it in seven. We come back to seal it so road salt can't eat the surface.

Driveways, patios
and everything flat.

Power float smoothing a fresh slab
[ 01 / 04 ]

Driveways

Tear out, compacted base, rebar, and a broom finish that grips in January. Sloped so water runs to the street, not the garage.

Get a price
Stamped concrete patio in warm evening light
[ 02 / 04 ]

Stamped and colored patios

Slate, flagstone or wood plank patterns, colored through and sealed twice so the color holds up to the Utah sun.

Get a price
Concrete pouring from a chute onto rebar while a screed levels it
[ 03 / 04 ]

RV pads and garage floors

Thick slabs for trailers, boats and shops. We pour six inches with heavier rebar where the weight sits.

Get a price
Excavator arm against an orange evening sky
[ 04 / 04 ]

Tear outs and footings

We break out and haul off old concrete, and dig and pour footings for decks, garages and additions.

Get a price

We also pour walkways, steps, curbs and window wells.

Our crew

First truck at six.

Swept by noon.

Our crew pours in the cool of the morning, when the mix behaves best. We finish, cut the joints, wash out on our own trailer, and sweep the street before we go.

480+Pours finished
2011Pouring in the valley since
7 daysBefore you park on it
2 yrWarranty on our work

Our work

[ 01 / 04 ]
Finisher running a power trowel across a new driveway slabResidential
West Jordan

Three car driveway

Tear outDriveway

Old slab was sinking at the garage. We dug out a foot of soft clay, rebuilt the base, and poured 1,100 square feet in one morning.

Two finishers in work boots troweling a fresh patio slabResidential
Sandy

Backyard patio and steps

PatioSteps

A wide patio off the kitchen with two shallow steps down to the lawn. Light broom finish so it stays safe when wet.

Smooth concrete terrace with long railing shadowsResidential
Bountiful

Front walk and porch

WalkwayColored

Replaced a heaved front walk and porch slab with a tinted mix that matches the stone on the house.

[ 04 / 04 ]

Your slab next?

Send a photo of the area and a rough size. We reply with a price range the same day.

Get a free estimate

Built on trust.
Backed by neighbors.

★★★★★

They dug out the soft clay under our old driveway instead of pouring over it. Two winters now and not one new crack.

BrianWest Jordan
★★★★★

Our stamped patio came out just like the sample board. They even matched the color to our brick.

LupeKearns
★★★★★

Showed up at six, poured by ten, and the street was swept before lunch. The crew was polite to every neighbor who walked by.

TomMagna

Where we pour.

Based in West Valley City. We pour across Salt Lake County, Utah County and Davis County.

  • West Valley City
  • Kearns
  • Magna
  • Taylorsville
  • West Jordan
  • South Jordan
  • Herriman
  • Riverton
  • Murray
  • Midvale
  • Sandy
  • Draper
  • Salt Lake City
  • Millcreek
  • Holladay
  • Bountiful
  • Farmington
  • Lehi
  • Eagle Mountain
  • Saratoga Springs

Good
questions.

[ 01 ]When can I drive on it?

Walk on it the next day. Wait seven days for cars, and about a month for a loaded RV or a heavy truck.

[ 02 ]Will my new concrete crack?

All concrete shrinks as it cures. We cut control joints so any cracks form in straight lines inside the joints, not across your slab. A good base keeps it from settling.

[ 03 ]Can you pour in winter?

Yes, down to about 35 degrees. We use a warmer mix, never pour on frozen ground, and cover the slab with blankets while it cures.

[ 04 ]Do I need a permit?

Footings and driveway approaches usually need one. We pull the permit for you and schedule the city inspection.

[ 05 ]Should I seal my driveway?

Yes. Road salt and freeze and thaw cycles flake bare concrete. We seal new work, and a fresh coat every two or three years keeps it that way.

[ Free estimate ]

Tell us about your slab.

A rough size and a photo is plenty. We reply the same day with a price range and a time to come measure.

(385) 555-0177
Best time to meet